Workshop B: Developing Flexible Manufacturing Models for Optimal Throughput & Seamless Project Execution
Time: 1:00 pm
day: Design Day
Details:
- Evaluating how contractors and manufacturers can better collaborate to develop adaptable production models that accommodate both large-scale and small-scale mass timber projects
- Ensuring production flexibility while meeting contractor needs for timely material delivery, precise cut specifications, and efficient on-site assembly
- Using real-time data and feedback to drive continuous improvement, refining production processes and project management, while ensuring cost and schedule accuracy